EasyManua.ls Logo

Mitsubishi Electric Melsec A Series - Page 146

Mitsubishi Electric Melsec A Series
204 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6. LOADING AND INSTALLATION
MELSEC-A
POINTI
.(1)
Ground
the
surge
absorber
(El)
an
the
PC (E2) separately from each
other.
(2) Select a
surge
absorber
making allowance
for
power
voltage
rises.
(2) Wiring of I/O
equipment
(a)
Applicable
size of wire
to
the
terminal
block
connector
is 0.3 (18)
to
2 mm
2
(14 AWG). However, it is
recommended
to
use
wires
of 0.75
mm
2
(18 AWG)
for
convenience.
(b) Separate
the
input
and
output
lines.
(c) I/O signal wires
must
be at least 100 mm (3.94 in) away from
high-voltage
and
large-current main
circuit
wires.
(d) When
the
I/O signal wires
cannot
be
separated
from
the
main circuit
wires
and
power
wires,
ground
on
the
PC side
with
batch-shielded
cables.
Under
some
conditions
it may be preferable
to
ground
on
the
other
side.
PC
Shielded cable
~-----7'
~
I
Input
<>-----.
Output
9--0--1
DC
(e) If wiring has been
done
with piping,
ground
the
piping.
(f) Separate
the
24 VDC I/O cables from
the
100 VAC
and
200
VAC
cables.
(g) If wiring over 200 m (656.2 tt) or
longer
distance,
trouble
can be
caused by leakage
currents
due
to
line
capacity
referring
to
the
I/O
error
examples in
the
A2C I/O
module
User's Manual.
6-6
•

Table of Contents

Other manuals for Mitsubishi Electric Melsec A Series

Related product manuals