EasyManua.ls Logo

Mitsubishi Electric MELSEC iQ-R Series - Page 1596

Mitsubishi Electric MELSEC iQ-R Series
2110 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1594
17 CC-LINK IE CONTROLLER NETWORK INSTRUCTIONS
17.4 Writing Clock Data to the Programmable Controller on Another Station
Processing details
Clock data is written from the target station CPU module. The target station is specified with the target network number (J)
or the start I/O number (U) of the own station or node and the target station number (s2). After completion of request to the
target station, the completion device specified by (d) turns on.
The specifiable stations are those with the specified network number that are included in one of the following networks.
The execution status and the completion status of the RTMWR instruction can be checked with the completion device (d)
and the completion status indication device (d)+1.
CH: Channel
MELSECNET/H
MELSECNET/10
CC-Link IE Controller Network
CC-Link IE Field Network
Ethernet
Completion device (d)
This device turns on during END processing of the scan where the RTMWR instruction completes, and turns off during the next END processing.
Completion status indication device (d)+1
This device turns on or off depending on the completion status of the RTMWR instruction.
When completed successfully: The device remains off.
When completed with an error: The device turns on during END processing of the scan where the RTMWR instruction completes, and turns off during the next
END processing.
(s4)
RTMWR
CH8
CHn
CH1
CC-Link IE Controller
Network moduleCPU module CPU module Network module
[Own station] [Target station]
Clock data

Table of Contents

Other manuals for Mitsubishi Electric MELSEC iQ-R Series

Related product manuals