EasyManua.ls Logo

Mitsubishi Electric MELSEC iQ-R Series - Page 1601

Mitsubishi Electric MELSEC iQ-R Series
2110 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17 CC-LINK IE CONTROLLER NETWORK INSTRUCTIONS
17.5 Setting the Station Number to Own Station
1599
17
Processing details
The station number of the normal, or own, station specified by (U) is set. After station number setting, the completion device
specified by (d) turns on.
The execution status and the completion status of the UINI instruction can be checked with the completion device (d) and
the completion status indication device (d)+1.
The following figure shows the UINI instruction execution timing.
Operation error
Completion device (d)
This device turns on during END processing of the scan where the UINI instruction completes, and turns off during the next END processing.
Completion status indication device (d)+1
This device turns on or off depending on the completion status of the UINI instruction.
When completed successfully: The device remains off.
When completed with an error: The device turns on during END processing of the scan where the UINI instruction completes, and turns off during the next END
processing.
Error code
((S)+1)
Description
E000H to EFFFH MELSEC iQ-R CC-Link IE Controller Network User's Manual (Application)
(s)
UINI
255→2
SW0042
CC-Link IE Controller
Network moduleCPU module
[Own station]
END0END0END0END0END0
OFF
OFF
OFF
OFF
OFF
ON
ON
ON
OFF
Sequence scan
UINI instruction
Start contact
Completion device (d)
1 scan
Completion of
the instruction
Completed successfully
Execution of the instruction
Completion status
indication device (d)+1
Completed with an error

Table of Contents

Other manuals for Mitsubishi Electric MELSEC iQ-R Series

Related product manuals