EasyManua.ls Logo

Mitsubishi Electric MELSEC iQ-RJ71C24-R2 - Timings of Transmitting Monitoring Results to the Target Device

Mitsubishi Electric MELSEC iQ-RJ71C24-R2
574 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
124
6 USING THE PROGRAMMABLE CONTROLLER CPU MONITORING FUNCTION
6.2 Programmable Controller CPU Monitoring Function
Timings of transmitting monitoring results to the target device
The following explains the timings for the transmission of CPU module monitoring results.
There are two transmission methods for transmitting the monitoring results of the CPU module on the host station to the target
device; fixed cycle send and condition match send. One of these methods must be selected by the user during programmable
controller CPU monitoring registration.
Fixed cycle send
The monitoring results are transmitted each time the monitoring information is read from the CPU module.
(Timing to transmit data)
END END END
END
Monitoring information
Constant cycle transmission
One-block
portion
One-block
portion
Target device
Cycle time
Program

Table of Contents

Other manuals for Mitsubishi Electric MELSEC iQ-RJ71C24-R2

Related product manuals