EasyManua.ls Logo

Mitsubishi Electric MELSEC-Q Series - Page 9

Mitsubishi Electric MELSEC-Q Series
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
Using programmable controllers
The programmable controllers are installed with procedures as shown below.
1 Preparing for Operation (P.8)
Preparing the necessary equipment.
2 System Configuration (P.9)
Introducing equipment used for operations in this Quick start guide.
3 Mounting Modules (P.10)
Mounting the CPU module and other modules on the base unit.
4 Wiring Modules (P.11)
Wiring the power supply module, the CPU module, and the I/O modules.
5 Checking Power Supply (P.13)
Turning ON the system to check the condition of the CPU module.
6 Programming (P.14)
Creating a program with GX Developer.
7 Writing Programs (P.21)
Writing a program created with GX Developer to the CPU module.
8 Checking Operation (P.25)
Executing the program by running the CPU module. Checking that ON/OFF
inputs correspond to ON/OFF outputs.

Other manuals for Mitsubishi Electric MELSEC-Q Series

Related product manuals