EasyManua.ls Logo

Mitsubishi Electric Q02HCPU-A - Page 136

Mitsubishi Electric Q02HCPU-A
262 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9 - 4
LOADING AND INSTALLATION9.
(7) Note the following when mounting the programmable controller to a DIN rail.
(a) Applicable DIN rail (JIS C 2812)
TH35-7.5Fe
TH35-7.5Al
TH35-15Fe
(b) DIN rail mounting screw pitch
When using DIN rail TH35-7.5Fe or TH35-7.5Al, secure the rail with the rail
mounting screws with a pitch of 200mm or less to ensure strength.
(8) When installing the base unit to DIN rain in an environment with large vibration, use a
vibration-proofing bracket (A1S-PLT-D). Mounting the vibration-proofing bracket
(A1S-PLT-D) enhances the resistance to vibration.
Depending on the environment to set up the base unit, it is also recommended to fix
the base unit to the control panel directly.
35mm
PPP
P = 200mm or less
DIN rail DIN rail mounting screw

Table of Contents

Related product manuals