EasyManua.ls Logo

Mitsubishi Electric QD62D - 4.2 Procedure Before Starting the Operation

Mitsubishi Electric QD62D
128 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 - 2 4 - 2
MELSEC-Q
4 SETUP AND PROCEDURE BEFORE STARTING THE OPERATION
4.2 Procedure Before Starting the Operation
The figure below shows the steps that should be followed before starting the
QD62(E/D) operation.
Perform the initial setting using the GX
Configurator-CT (see Section 7.4).
Perform settings using the GX Developer
(see Section 4.5)
Start
Module mounting
Mount the QD62(E/D) in the specified slot.
Wiring
Wire external devices to the QD62(E/D).
Intelligent function module switch setting
Use the GX Configurator-CT?
Yes
No
Initial setting
Using the FROM/TO commands, create
a sequence program for writing initial values.
Initial setting
Perform automatic
refresh setting?
No
Yes
Automatic refresh setting
Perform the automatic refresh setting
using the GX Configurator-CT
(see Section 7.5).
Programming
Create and check a counter processing
program without using the FROM/TO commands.
Programming
Create and check a counter processing
program using the FROM/TO commands.
Operation
4

Table of Contents

Related product manuals