EasyManua.ls Logo

Mitsubishi Electric R60AD8-G - 14 TROUBLESHOOTING

Mitsubishi Electric R60AD8-G
342 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13 MAINTENANCE AND INSPECTION
303
13
13 MAINTENANCE AND INSPECTION
This chapter describes inspection to be performed for using the R60AD8-G in SIL2 mode.
Periodic inspection
Perform the following inspection one or two times in 6 months to a year. Perform it as well after equipment is transferred or
modified, or wiring is changed.
Check that the relay switching is properly performed by a continuity check for relays.
For other inspection items, refer to the following.
MELSEC iQ-R Module Configuration Manual

Table of Contents

Related product manuals