EasyManua.ls Logo

Mitsubishi SUZ-A09VR - Page 73

Mitsubishi SUZ-A09VR
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
73
OPERATING PROCEDURE
PHOTOS
4. Removing the defrost thermistor and discharge tem-
perature thermistor
(1) Remove the top panel, cabinet and service panel.
(Refer to 1.)
(2) Disconnect the indoor/outdoor connecting wire and remove
the back panel. (Refer to 1.)
(3) Remove the inverter assembly. (Refer to 2.)
(4) Pull out the defrost thermistor from its holder. (Photo 6)
(5) Pull out the discharge temperature thermistor from its
holder. (Photo 5)
Photo 5
Photo 6
Defrost
thermistor
Discharge temperature thermistor
R.V. coil
OC304A --3qxp 04.6.29 8:34 AM Page 73

Related product manuals