Please ensure that operation manual is read and observed in
full by all persons working with the steam boiler.
Please also ensure that it is stored in a location where it may
be easily accessed by said persons.
INFORMATION IN THIS MANUAL MAY BE CHANGED
WITHOUT ANY NOTICE.
MIURA STEAM BOILER
OPERATION MANUAL
LX-50 LXL-50
LX-100 LXL-100
LX-150 LXL-150
LX-200 LXL-200
LXH-200 LX-300
LXH-300
Operation Manual Number
:
T5
1
9
-
998
-
9
0
0
7
Date of issue : Aug. 16, 2017

Table of Contents

Other manuals for Miura LX Series

Question and Answer IconNeed help?

Do you have a question about the Miura LX Series and is the answer not in the manual?

Miura LX Series Specifications

General IconGeneral
BrandMiura
ModelLX Series
CategoryBoiler
LanguageEnglish

Summary

Basic Precautions

Handling Abnormal Conditions

Immediate actions to take for unusual conditions like gas leaks or smoke to prevent fire or explosion.

Prohibition of Unapproved Modifications

Warning against unauthorized customization or modification of the boiler for safety reasons.

Essential Boiler Water Treatment

Water Treatment Guidelines

Guidelines and recommendations for proper water management and treatment for steam boilers.

Component Names and Functions

Using Boiler Controls

Operating the Main Steam Valve

Step-by-step instructions and safety precautions for opening and closing the main steam valve.

Preparing for Startup

Operating the Steam Boiler

Boiler Startup Procedure

Detailed steps for safely starting the boiler, including checks and operation sequence.

Inspection During Operation

Key checks to perform while the boiler is running, focusing on noise, gauges, and leaks.

Boiler Shutdown Procedure

Steps for safely shutting down the boiler, including turning off power and closing valves.

Inspection & Maintenance

Regular Maintenance Tasks and Timing

Schedule and frequency for routine inspections and cleaning tasks to ensure optimal performance.

Blowdown & Low Water Level Interlock Test

Procedure for performing blowdown and testing the low water level interlock system.

Inspecting the Safety Valve

Importance and procedure for regular inspection of the safety valve to prevent damage and explosion.

Breakdown & Countermeasures

Alarm and Red Status Lamp

How the system indicates an alarm, including audible alerts and red status lamp.

Action Before Ordering Repairs

Table of symptoms, causes, and required actions for alarms and cautions to troubleshoot issues.