Page|13
41 Daggett Drive, San Jose, CA 95134
Phone: +1 (650) 962 9620 Fax: +1 (650) 962-9647 Email: info@mmr-tech.com Web: www.mmr‐tech.com
GeneralOperation
Stage Preparation
1.StageInstallation.
1.1. RemoveaSeebeckStagefromthepackage.
1.2. PutathinlayerofthermalgreaseonthelargeCopperplate(underside).
1.3. Unlock the ZIF connector (if present) on the pre‐amplifier board in the vacuum chamber. Using
thumbsoneachsideoftheconnecter,
inserttheSeebeckstagefully.
1.4. Affix the Seebeck Stage to The Cold Stage by the springfasteners. Be extremely careful! Do not
applyanydownwardforceontherefrigerator.Usetweezerstoadjustthefastenersduringinstallation.
You can move the Seebeck Stage backwards and forwards by a couple
of millimeters to get the best
location.
1.5. LocktheZIFconnector(ifpresent).
1.6. Installthecoveronthevacuumchamber.
2. ConnecttheRibboncablefromtheChambertotheSB1000.IfaK2000ispresentfortemperature
control,ensuretheLinkRibbonCableisinstalledfromthe
SB1000totheK2000.
3. If you are going to use the system at temperatures below ambient, you should also install all
systemcomponentsrequiredforcoolingaccordingtotheMMRRefrigeratorsManual.