Installation
24
10/06 AWB2300-1433GB
ZEV-XSW-820 strapped to a > 50 mm
2
power cable
Figure 17: Mounting on power cable
X Place the strap around the busbar.
X Engage the lock pin.
X Fasten the strap.
Figure 18: Installation of the sensor cables
X Install the sensor cable so that each one is looped around
one busbar only.
h
Use additional cable ties at temperatures > 50 °C.