WATER SYSTEM SETUP PROCEDURE
It is imperative that the water delivery to the deck oven is checked for the
steam system to operate correctly
1. Flush out the main feed pipe to be used, until water runs clear and free from debris.
2. Connect main feed to oven.
3. Connect flexible hoses to each deck.
4. Place a container under the test valve.
5. Slowly open test valve fully and with the water flowing check the regulator is set to
0.75 bar. If not adjust using the screw on the regulator.
Never use the oven above this setting
6. When the pressure has stabilised, shut the test valve.
REPEAT 4,5 AND 6 AT THE END OF INSTALLATION.
NOTE. DYNAMIC PRESSURE, NOT STATIC, IS BEING MEASURED.