Monogram Sanitation
COMPONENT MAINTENANCE MANUAL
PN 15900-012 Series
38-31-07
Jan 10/95
Page 702
2. Assembly Instructions
A. Toilet Assembly, PN 15900-012 (refer to IPL Figure 1)
(1) List of Materials
NOTE: Equivalent substitutes may be used for listed items.
3. Procedures
(a) Install O-ring (500) on tank and top assembly (535).
(b) Assemble and install seat assembly (510) as follows:
(1) Install hinge (520) with screws (515).
(2) Install bumpers (525) to seat (530).
(c) Install transmitter mounting plate (485), new gasket (480) and new O-ring (495) on tank and
top assembly (535) with screws (490).
(d) Install liquid level transmitter (460) with screws (465) and washers (470) and (475).
(e) Install grounding strap (435) and grounding stud (440) with nut (455) and washer (445) and
(450).
(f) Install tie down brackets (405) with nuts (410) and washers (415).
(g) Install timer assembly (385) and new gasket (400) to timer bracket (405) with screws (390) and
washers (395).
(h) Install timer connector to bracket (355) with screws (370), washers (375) and nuts (380).
(i) Install connector bracket (355) with nuts (360) and washers (365).
Adhesive No. 1357 Minnesota Mining &
Manufacturing Co.
Adhesive Division
St. Paul, MN 55101
Assembly Materials
Table 701
SOURCEDESCRIPTIONITEM