F. Bowl Flushing Test
(1) Fill the toilet tank to the specified precharge level (see Leading Particulars).
(2) Upon flushing the toilet it should be observed that the bowl is completely wetted
and water action is vigorous without excessive splashing.
(3) Repeat flushing operation four times to confirm adequate bowl coverage and
water action.
(4) Drain toilet.
G. Liquid Level Sensor Test
(1) Connect the liquid level sensor to the appropriate test harness.
(2) Fill the toilet tank to the precharge level.
(3) Ensure that the precharge indicator light is on.
(4) Continue filling the toilet tank to the full level as indicated in the drawing.
(5) Ensure that the full indicator light is on, and the solenoid valve is shut off.
H. Leak Test
(1) Cap the tank vent. Fill the toilet through the bowl aperture until the water level
is approximately one inch below the bowl flush ring.
(2) Remove any air trapped within the tank.
(3) Allow the toilet to remain in this condition for one hour after which there shall
be no evidence of leakage from any of the toilet components, including the toilet
tank, tank top, gaskets and fitting.
I. Disconnect water supply.
J. Disconnect power supply.
K. Drain all water from tank and remove all water from components.