PREPARING FOR FIELD LEVEL TESTING: Main Board Assembly (Continued)
Main Board Assembly (Continued)
Tools Required:
Screw nest D310-40
5. Assemble the Bluetooth Antenna into the Front Housing.
6. Apply the conductive poron pad to the Battery Frame. Ensure the right end of the frame in the
proper location.
7. Assemble the Battery Frame to Front Housing from right to left and ensure the hinge connector
was covered by frame completely.
8. Apply the radio label on the front housing.
5 6
7 8