Manual for MVK-MPNIO Modules
54 V 1.9
The related cable must be changed as soon as possible.
T
hese diagnostic alarms (maintenance requirements) are only activated in the S7 project if the
settings of the fiber optic ports are set to: Automatic Settings (monitor).
41. P
ort Settings POF
4.2.9 Plan Shared Device
B
eginning with version 4.0 MVK can be planned in a shared device project..
St
ep 1. Start project with two PLC:
42. HW
config with two PLC