EasyManua.ls Logo

Murr Elektronik 55283 - Plan Shared Device

Murr Elektronik 55283
79 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Manual for MVK-MPNIO Modules
54 V 1.9
The related cable must be changed as soon as possible.
T
hese diagnostic alarms (maintenance requirements) are only activated in the S7 project if the
settings of the fiber optic ports are set to: Automatic Settings (monitor).
41. P
ort Settings POF
4.2.9 Plan Shared Device
B
eginning with version 4.0 MVK can be planned in a shared device project..
St
ep 1. Start project with two PLC:
42. HW
config with two PLC

Related product manuals