EasyManua.ls Logo

NCR 7772-1316-8801 - Powering Up the Terminal

NCR 7772-1316-8801
95 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Hardware Installation 2-35
Powering Up the Terminal
1. After installing the terminal, power up the system by pressing the Power Switch,
which is located on the bottom of the display.
The system installs the system devices, system settings, and then reboots to continue
setup. Complete the System Setup. This varies from OS to OS but the following is
typical.
2. The initial setup procedures are performed:
Starting Windows
Preparing the computer for first time
Checking video performance
3.
Accept the License Terms Agreement.
Note: Depending on the installed operating system and the selected settings, the
amount of time it takes to boot up may vary.

Table of Contents

Related product manuals