2-Bag Bagwell Upgrade 29
Routing Cables
To route cables when installing a new Bagwell, follow these steps:
Note: If a new Bagwell is installed to a No-Bag unit, refer to Routing Cables for No-Bag
unit on page32.
Note: Use the new pre-installed USB Power Cable only when installing a new Bagwell
to a No-Bag unit. If not, reuse the existing USB Power Cable of the previous Bagwell.
1. Retrieve the USBPower Cable from the Core and route to the Scale Controller
through the smaller opening of the Bagwell frame as shown in the image below.