NCR RealPOS 25 Terminal Site Preparation 25
2. Route the cables through the Cable Strain Relief and over the Cable Guide as shown
below.
3. Replace the Stand Cable Cover.
Customer Display Configuration
If configured with a Customer Display the cables are routed from the bottom of the
Stand up through the Customer Display Pole.