8. Connect the VOIPDB-C1 to an Switching hub using an LAN Cable.
The LAN Cable must pass two times (two rounds) through the Ferrite Core as below. (Ferrite
Core is attached with VOIPDB-C1)
VOIPDB-C1 board (CN1)
Ferrite Core
VOIP
to HUB
LAN Cable
30 - 50 mm
(1.181 - 1.967)
Pass 2 times
< Bottom View >
Figure 2-96 Connecting a LAN Cable
9. Refer to the SL Programming Manual for detailed programming instructions.
The VoIP feature requires system configuration.
For the details of setting and operation, refer to the SL Features & Specifications Manual
(separate issue).
4.2.4 LED Indication
LED indications for the IP4WW-VOIPDB-C1 are listed Table 2-19 VOIPDB LED Indications on
page 2-68. Each LED is listed with its associated function and operational status.
VOIPDB-C1
board
LINK10
LINK100
LINK1000
ACT
< Bottom View >
Figure 2-97 Location of LEDs
ISSUE 3.0
SL1000
Hardware Manual 2-67