EasyManua.ls Logo

NEC SL2100 - Page 188

NEC SL2100
218 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ISSUE 4.0 SL2100
SYSTEM START UP 186
If Expansion Chassis are installed, turn the power on/off in the order of
Expansion 2 Chassis, Expansion 1 Chassis and then Main Chassis.
To perform a Cold Start;
1. Set the power switch to off position.
Figure 3-1 Power Switch Location
2. Once the system has powered off, push in and hold the LOAD button on the CPU board.
If Expansion Chassis are installed, the Power Switch must be ON at
Expansion Chassis.
3. Turn the power switch ON at the Main Chassis.
4. Continue holding the LOAD button for approximately three seconds or until ALM LED lights (red).
LOAD button
ALM LED
RUN LED
CPU board
< Side View >
Figure 3-2 ALM LED and RUN LED Location
5. Release the LOAD button.
ST 100 1G ACT
ETHERNET VOIPDB
RUN ALM LOAD
EXP1
EXP2

Table of Contents

Other manuals for NEC SL2100

Related product manuals