EasyManua.ls Logo

NEC SL2100 - SECTION 7 SOFT KEYS OPERATION - STANDARD MODE; 7.1 Soft Key Structure When PRG 15-02-60 is set to Standard Mode

NEC SL2100
218 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ISSUE 4.0 SL2100
INSTALLING THE MAIN & EXPANSION CHASSIS 48
Figure 2-14 Horizontal Arrangement of Chassis and Battery Boxes
1.6 Rack Mounting the Chassis
Main or Expansion chassis can be put into 19 inch rack using a shelf plate one by one refer to
Figure 2-15 Rack Mounted Chassis.
If the system required two or three chassis simultaneously put on the shelf plate of 19 inch rack, the
space must be required between chassis for heat ventilation.
Do not stack two or three chassis per one shelf plate.
Shelf Plate
Figure 2-15 Rack Mounted Chassis
1.7 Installing the Expansion Chassis
1.7.1 General
Each Expansion Chassis is connected to the Main Chassis individually. The EXIFB-C1 board must be
installed on the CPU board in the Main Chassis. And the EXIFE-C1 board must be installed on the
Each Expansion Chassis.
44.5 mm (1.75″)

Table of Contents

Other manuals for NEC SL2100

Related product manuals