EasyManua.ls Logo

NEC SL2100 - Page 69

NEC SL2100
218 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ISSUE 4.0 SL2100
INSTALLING THE EXTERNAL BACKUP BATTERY 67
1. Assemble the FM/WM Base-F, Base-R and WM Support.
WM Support
FM/WM Base-R
FM/WM Base-F
Figure 2-40 Bases and Support of the Battery Box
2. Refer to Figure 2-41 Floor-Mount Spacing Guide for required spacing before
drilling holes for 10 mm (0.394″) anchor bolts (locally procured).
Mark and drill the four holes required to install the FM/WM Base.
3. Using anchor bolts, secure the FM/WM Base to the floor.
Figure 2-41 Floor-Mount Spacing Guide
Four Anchor bolts
M10 mm (0.394)
Front side
: Maintenance space
Wall
150 mm
(5.906″)
460 mm (18.
1
10″)
AC inlet
side
500 mm (19.685″)
190 mm
(7.480″)
Anchor bolt location

Table of Contents

Other manuals for NEC SL2100

Related product manuals