EasyManua.ls Logo

NEC SL2100 - 2.7 IP4 WW-Battery Box to Chassis Connection

NEC SL2100
218 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ISSUE 4.0 SL2100
INSTALLING THE EXTERNAL BACKUP BATTERY 72
6. Using one supplied screw (M3x6 with washer), secure the back plane of the Battery Box to the FM/WM Base.
Two screw holes
(Use either one)
< Front view>
Figure 2-48 Securing the Battery Box
2.7 IP4WW-Battery Box to Chassis Connection
To avoid damage to equipment, do not install the Topaz Battery Box
(DX2E-32i/NX7E Battery Box) to the SL2100 system.
Make sure the system power is off.
If Expansion Chassis are installed, turn the power on/off in the order of Expansion 2
Chassis, Expansion 1 Chassis and then Main Chassis.
1. Power off the Chassis and disconnect AC cord.

Table of Contents

Other manuals for NEC SL2100

Related product manuals