ISSUE 4.0 SL2100
INSTALLING THE EXPANSION INTERFACE BOARDS 78
Section 3 INSTALLING THE EXPANSION INTERFACE BOARDS
3.1 General
Not all boards are hot swappable. Do not remove or install from the chassis
when powering up.
Except 1PRIDB daughter board, up to four expansion interface boards can be installed per Chassis.
8 Digital Extensions + 2 Analog Extensions Board
8 Analog Extensions Board
0 Extensions Board (for Trunk DB)
3 Analog Trunks Daughter Board (mount to 082U/008U/000U)
1 ISDN PRI/T1/E1(for Latin America) Daughter Board (mount to 082U/
008U/000U)
• The function of IP7WW-000U-C1 board is just a mounting board for the 3COIDB or 1PRIDB.
• One 1PRIDB can be installed per one chassis.
• The 3COIDB-B1 and 1PRIDB-C1 can be installed in following combinations;
3.2 Unpacking
Unpack the 082U-B1/008U-C1/000U-C1/3COIDB-C1/1PRIDB-C1 and check it against the following
list. Inspect for physical damage.
Table 2-12 Expansion Board Packing List
Screw (with Washer and Spring Washer)
Screw (with Washer and Spring Washer)
3.3 Mounting the Expansion Interface Board
DO NOT POWER ON until all installation has been completed.
Fit the optional 3COIDB-C1/1PRIDB-C1 daughter boards before installing the 082U-B1/008U-C1/000U-
C1 boards.