Issue 1.2 UNIVERGE SV9100
3 - 66 Installing the SV9100 Chassis
6. Insert the access panel tab into the rear of the CHS2UG chassis
running the Battery Connection Cable through the cutout. Secure
panel with the retaining screw.
7. Connect grounding and AC power cables.
Figure 3-91 Dual CHSG LARGE BATT BOX Connection