EasyManua.ls Logo

NEC Univerge SV9100 - Page 407

NEC Univerge SV9100
478 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
UNIVERGE SV9100 Issue 1.2
System Hardware Manual 5 - 147
2. Route the cable through the channel.
Figure 5-172 Install AP300 Base Station
3. Connect the other end of the cable to your TCP/IP network.
When the base station powers on, the STATUS LED on the
front briefly lights yellow and then turns off while it initializes
and connects to the network. After the base station
successfully initializes and connects to the network, the Yellow
LED light remains steady on (refer to Table 5-19 Base Station
LED States and Meanings on page 5-147).
Table 5-19 Base Station LED States and Meanings
LED Status State Meaning
Top LED, Yellow
Off No Power
0.5 seconds on - 0.5
seconds off
Loading software/firmware
Short flash every
0.25 seconds
IP Network error (not connected, no DHCP/
TFTP server, no DAP Controller
Fast Blink
DAP Operational but trying to synchronise to
another DAP
Continuous Fast
Blink
Hardware Error
Steady On
DAP Operational (and synchronised to other
DAP or is the synchronisation master)

Table of Contents

Other manuals for NEC Univerge SV9100

Related product manuals