EasyManua.ls Logo

NEC Univerge SV9100 - Page 30

NEC Univerge SV9100
105 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Issue 1.0
UNIVERGE SV9100
18
System Maintenance
F1
Remove it.
Report Problem
to
Telco.
Check line with dB
meter
and/or contact
Telco.
Done.
1.
Perform Second Initialization, and test.
2.
Perform First Initialization, and test with
default
program.
3.
Replace GCD-CP10.
Run a dB level test at DMARK
on lines
with 1 kHz test tone. No
less than -8dB
at MDF is
required.
Replace GCD-4COTA.
Replace
Multiline
SLT.
Move suspected bad line to
good
GCD-4COTA port. Move
good line to
original
GCD-4COTA port.
Reset or replace
G
CD-
4COTA and test again.
Low Volume Problems
No
Yes
All lines?
Yes
Bridge on
system CO
line?
Yes
No
All stations?
No
Yes
Port
Line
Less than
-8 dB?
Problem
on port or
line?
No
Yes
Problem
solved?
No

Table of Contents

Other manuals for NEC Univerge SV9100

Related product manuals