FlexPAK 800/1000
17
EN
NOTE! Standards relang to the connecon and use of lters in hazardous areas are to
be taken into consideraon, especially naonal standards for installaon. Only trained
personnel familiar with these standards is allowed to handle this type of lter.
NOTE! The designer of the system as a whole, has to guarantee the correct funcon of
all interacng products or components and ensure that the complete system meets all
necessary safety requirements.
NOTE! Make a layout for the enre system before installing the unit.
NOTE! Fill in the installaon protocol during installaon, see ‘Appendix A: Installaon
protocol’.
5.1 Delivery check
Check the unit for any transport damage. In case of damage or missing parts, nofy the
carrier and your local Nederman representave immediately.
5.2 Installaon requirements
Prepare the locaon where FlexPAK 800/1000 is to be placed before installaon. Consider
the following when installing the unit:
• The unit is to be anchored to a hard, level and rm foundaon. There are four
fastening brackets on the boom frame to be used to fasten the unit to the raised
foundaon.
• The total weight of the unit with accessories.
• Maximum weight of the collected material.
• Do not install the unit close to heat sources or hot surfaces.
• Beware of hot air from the outlet.
• Ensure that handling is convenient.
• Ensure that emptying collected dust is convenient.
• Ensure that service and maintenance are convenient.
• In case of high relave humidity, do not expose the unit to freezing temperatures.
• Do not place the unit in direct sunlight.
5.3 Duct dimensions and installaon
Figure 9 shows the unit installaon in a typical vacuum duct system.
5.3.1 Requirements
Place a sign with the intended use of the vacuum system on every user interface
(workstaon). Inform all personnel of the intended use of the system. Ensure that
personnel using the equipment do not collect items that may cause ignion or blocking.