EasyManua.ls Logo

NetApp AFF A900 - Page 22

NetApp AFF A900
114 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Lettered and numbered I/O cam latch
I/O cam latch completely unlocked
6. Install the I/O module into the target slot:
a. Align the I/O module with the edges of the slot.
b. Slide the I/O module into the slot until the lettered and numbered I/O cam latch begins to engage with
the I/O cam pin.
c. Push the I/O cam latch all the way up to lock the module in place.
7. Repeat the remove and install steps to replace additional modules for controller A.
8. If the replacement I/O module is a NIC, cable the module or modules to the data switches.
9. Reboot the node from the LOADER prompt: bye
10.
Give back the node from the partner node.
storage failover giveback -ofnode
target_node_name
11.
Enable automatic giveback if it was disabled:
storage failover modify -node local -auto
-giveback true
12. If you added:
20

Other manuals for NetApp AFF A900

Related product manuals