All drive shelves must be working properly.
If your system is a FlexArray system or has a V_StorageAttach license, you must refer to the additional
required steps before performing this procedure.
If your system is in an HA pair, the healthy node must be able to take over the node that is being replaced
(referred to in this procedure as the “impaired node”).
If your system is in a MetroCluster configuration, you must review the section
Choosing the correct
recovery procedure
to determine whether you should use this procedure.
If this is the procedure you should use, note that the controller replacement procedure for a node in a four
or eight node MetroCluster configuration is the same as that in an HA pair. No MetroCluster-specific steps
are required because the failure is restricted to an HA pair and storage failover commands can be used to
provide nondisruptive operation during the replacement.
You must replace the failed component with a replacement FRU component you received from your
provider.
You must be replacing a controller module with a controller module of the same model type. You cannot
upgrade your system by just replacing the controller module.
You cannot change any drives or drive shelves as part of this procedure.
In this procedure, the boot device is moved from the impaired node to the replacement node so that the
replacement node will boot up in the same version of ONTAP as the old controller module.
It is important that you apply the commands in these steps on the correct systems:
The impaired node is the node that is being replaced.
The replacement node is the new node that is replacing the impaired node.
The healthy node is the surviving node.
You must always capture the node’s console output to a text file.
This provides you a record of the procedure so that you can troubleshoot any issues that you might
encounter during the replacement process.
Shut down the impaired node - AFF A900
You can shut down or take over the impaired controller using different procedures,
depending on the storage system hardware configuration.
Option 1: Most configurations
To shut down the impaired node, you must determine the status of the node and, if
necessary, take over the node so that the healthy node continues to serve data from the
impaired node storage.
About this task
If you have a cluster with more than two nodes, it must be in quorum. If the cluster is not in quorum or a healthy
node shows false for eligibility and health, you must correct the issue before shutting down the impaired node;
see the
Administration overview with the CLI.
Steps
1. If AutoSupport is enabled, suppress automatic case creation by invoking an AutoSupport message: