EasyManua.ls Logo

NetApp AFF A900 - Page 68

NetApp AFF A900
114 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
If the system-level diagnostics
tests…
Then…
Were completed without any
failures
a.
Clear the status logs:
sldiag device clearstatus
b.
Verify that the log was cleared:
sldiag device status
The following default response is displayed:
SLDIAG: No log messages are present.
c.
Exit Maintenance mode:
halt
The node displays the LOADER prompt.
d.
Boot the node from the LOADER prompt:
bye
e. Return the node to normal operation:
If your node is in… Then…
An HA pair
Perform a give back: storage failover giveback -ofnode
replacement_node_name
Note: If you disabled automatic giveback,
re-enable it with the storage failover modify command.
Resulted in some test failures Determine the cause of the problem:
a.
Exit Maintenance mode:
halt
After you issue the command, wait until the system stops at the
LOADER prompt.
b. Turn off or leave on the power supplies, depending on how many
controller modules are in the chassis.
Leave the power supplies turned on to provide power to the other
controller module.
c. Verify that you have observed all the considerations identified for
running system-level diagnostics, that cables are securely
connected, and that hardware components are properly installed in
the storage system.
d. Boot the controller module you are servicing, interrupting the boot by
pressing
Ctrl-C when prompted to get to the Boot menu.
The controller module boots up when fully seated.
e. Select Boot to maintenance mode from the menu.
f.
Exit Maintenance mode by entering the following command:
halt
After you issue the command, wait until the system stops at the
LOADER prompt.
g. Rerun the system-level diagnostic test.
66

Other manuals for NetApp AFF A900

Related product manuals