EasyManua.ls Logo

NetApp AFF C250 - Page 134

NetApp AFF C250
314 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
-quorum-warnings true -inhibit-takeover true.
For clusters using SnapMirror synchronous operating in StrictSync mode: system
node halt -node * -skip-lif-migration-before-shutdown true
-ignore-quorum-warnings true -inhibit-takeover true -ignore
-strict-sync-warnings true
7.
Enter y for each controller in the cluster when you see
Warning: Are you sure you want to
halt node "cluster name-controller number"?
{y|n}:
8. Wait for each controller to halt and display the LOADER prompt.
9. Turn off each PSU or unplug them if there is no PSU on/off switch.
10. Unplug the power cord from each PSU.
11. Verify that all controllers in the impaired chassis are powered down.
== Option 2: Shut down a controller in a two-node MetroCluster configuration
To shut down the impaired controller, you must determine the status of the controller and, if necessary,
switch over the controller so that the healthy controller continues to serve data from the impaired
controller storage.
About this task
If you are using NetApp Storage Encryption, you must have reset the MSID using the instructions in
the "Return a FIPS drive or SED to unprotected mode" section of NetApp Encryption overview with
the CLI
.
You must leave the power supplies turned on at the end of this procedure to provide power to the
healthy controller.
Steps
1. Check the MetroCluster status to determine whether the impaired controller has automatically
switched over to the healthy controller:
metrocluster show
2. Depending on whether an automatic switchover has occurred, proceed according to the following
table:
If the impaired controller… Then…
Has automatically switched over Proceed to the next step.
Has not automatically switched
over
Perform a planned switchover operation from the healthy
controller:
metrocluster switchover
Has not automatically switched
over, you attempted switchover
with the
metrocluster
switchover
command, and
the switchover was vetoed
Review the veto messages and, if possible, resolve the issue and
try again. If you are unable to resolve the issue, contact technical
support.
3.
Resynchronize the data aggregates by running the
metrocluster heal -phase aggregates
132

Other manuals for NetApp AFF C250

Related product manuals