25 GbE cable X66240A-05 (112-00595),
0.5m;
X66240-2 (112-00573),
2m
Cluster interconnect
network
X66240A-2 (112-00598),
2m;
X66240A-5 (112-00600),
5m
Data
100 GbE cable X66211-2 (112-00574),
2m;
X66211-5 (112-00576),
5m
Storage
RJ-45 (order dependent) Not applicable Management network
(BMC and wrench port)
and Ethernet data (e0a
and e0b)
Fibre Channel X66250-2 (112-00342)
2m;
X66250-5 (112-00344)
5m;
X66250-15 (112-00346)
15m;
X66250-30 (112-00347)
30m
Micro-USB console cable Not applicable Console connection
during software setup
Power cables Not applicable Powering up the system
1. Review the
ONTAP Configuration Guide and collect the required information listed in that guide.
Step 2: Install the hardware
You need to install your system in a 4-post rack or NetApp system cabinet, as applicable.
Steps
1. Install the rail kits, as needed.
2. Install and secure your system using the instructions included with the rail kit.
3