Do you have a question about the NewAge Products VERSARAC PRO and is the answer not in the manual?
Brand | NewAge Products |
---|---|
Model | VERSARAC PRO |
Category | Racks & Stands |
Language | English |
Details what the warranty covers regarding defective materials or workmanship.
Lists exclusions like damage from misuse, accident, improper installation, or non-household use.
Disclaims implied warranties like merchantability or fitness for a particular purpose.
Limits remedies to repair/replacement and excludes incidental/consequential damages.
Details installing a single unit to the ceiling, referencing page 10 for the process.
Explains installing two units horizontally, referencing pages 19 and 10.
Covers installing two units vertically, referencing pages 20 and 10.
Decide whether to install the VersaRac Pro parallel or perpendicular to ceiling studs.
Check ceiling stud spacing to ensure compatibility with the rack's size and direction.
Locate and mark the center of ceiling studs for bracket placement using a stud finder.
Mark reference points (A1, B1) and layout lines based on desired orientation and measurements.
Mark diagonal lines and extend them to align with subsequent studs for bracket positioning.
Mark the final positions (A2, B2, C2, D2) for installing the ceiling brackets.
Pre-drill 3.125-inch deep pilot holes into the ceiling stud using a 3/16-inch drill bit.
Attach the first ceiling bracket using lag screws and flat washers, noting orientation relative to studs.
Set the desired height for the VersaRac Pro from the ceiling to the bottom of the rack.
Connect vertical posts and attach them to ceiling brackets using bolts, washers, and nuts.
Secure sway brackets diagonally onto the ceiling bracket and top vertical post for stability.
Install the second top ceiling bracket and vertical post, ensuring correct spacing.
Continue installing vertical posts for the entire system, ensuring proper alignment and spacing.
Insert side beams into the keyhole slots of the vertical posts, ensuring they are at the same height.
Bolt the two front perimeter beams and the front L joining bracket together using carriage bolts and lock nuts.
Guide the shoulder rivets of the front beams into the keyhole slots of the vertical posts.
Repeat steps for installing the horizontal rear perimeter beams to complete the frame.
Assemble and attach 4ft cross supports to the perimeter frame using bolts, washers, and nuts.
Slide grid sections onto supports, ensuring proper orientation and seating for the wire grid assembly.
Install the first VersaRac Pro unit by following the steps outlined from page 13 to 18.
Prepare the installation location for the second VersaRac Pro by following the planning steps on pages 11 and 12.
Install the second VersaRac Pro unit alongside the first, following the general installation steps.
Insert beams into vertical posts, offsetting perimeter beams from the bottom post by 3 inches.
Follow specific steps for perimeter beams and grid assembly for the vertically stacked units.
Install vertical posts at the bottom of the first VersaRac Pro, noting specific post types for the second unit.
Continue installing perimeter beams and remaining components for the bottom VersaRac Pro unit.
Guidance on installing additional studs using hangers if ceiling stud spacing is incompatible.
Instructions for installing additional wooden studs perpendicular to engineered studs for secure bracket fastening.