Inspection of the installation
In addition, fill in the page for the installation data in the User Manual.
Current regulations require the supply air module to be inspected before it is put into service. The inspection must
be carried out by a suitably qualified person.
DateSignatureNotesDescription
Ventilation (page 16)
Setting ventilation flow exhaust air
Setting ventilation flow supply air
Heating medium (page 12)
System flushed
Accessories bled
Check against output and pressure drop
diagrams
Connected according to outline diagram
Electricity (page 17)
Connections
Phase voltage
Supply connected 230 V
Connected communication
5Chapter 1 | Important informationSAM 40