INTAKE MANIFOLD COLLECTOR
EM-25
< REMOVAL AND INSTALLATION >
[VQ40DE]
C
D
E
F
G
H
I
J
K
L
M
A
EM
N
P
O
INTAKE MANIFOLD COLLECTOR
Exploded View INFOID:0000000008798964
Removal and Installation INFOID:0000000008798965
NOTE:
When removing components such as hoses, tubes/lines, etc., cap or plug openings to prevent fluid from spill-
ing.
REMOVAL
1. Remove air duct and resonator assembly. Refer to EM-24, "Removal and Installation".
2. Remove electric throttle control actuator as follows:
a. Partially drain engine coolant. Refer to CO-11, "Changing Engine Coolant"
.
WARNING:
To avoid the danger of being scalded, do not drain engine coolant when engine is hot.
CAUTION:
• Perform when engine is cold.
• Do not spill engine coolant on drive belt.
b. Disconnect water hoses from electric throttle control actuator.
c. Disconnect harness connector.
1. Vacuum tank 2. VIAS control solenoid valve 3. Vacuum hose
4. Intake manifold collector support 5. Water hose 6. Electric throttle control actuator
7. Water hose 8. EVAP hose 9. Bracket
10. EVAP hose 11. EVAP canister purge volume control
solenoid valve
12. Gasket
13. Gasket 14. Intake manifold collector 15. Clip
16. PCV hose 17. Connector 18. PCV hose
a. To intake manifold collector b. To power valve c. To throttle body
d. To cylinder head (RH bank)
WBIA0731E
Revision: January 2013 2013 Xterra