EasyManua.ls Logo

Nord Drivesystems SK 10307 - Optional; Table 11: Optional Checklist for Commissioning

Nord Drivesystems SK 10307
112 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 Commissioning
B 1050 en-1819 67
4.11.2 Optional
Checklist
Subject of test
Date
checked:
Information
see Section
Option R, WX, FAN:
Is the direction of rotation specified and checked?
4.9
Option D and ED:
Is the torque support correctly fitted?
3.18
Option AS, FAN:
Are contact guards fitted to rotating components?
3.21
Option FAN, CS2:
Is an adequate supply of air ensured?
4.4
Option CS1, CC:
Is the cooling water connected to the cooling unit or the cooling
coil and open?
4.5
Option CS1, CS2:
Is the cooling unit connected to the gear unit?
4.6
Option: LC, LCX:
Has the pressure switch been functionally connected?
4.3
Option PT100:
Has the temperature monitor been functionally connected?
4.8
Option AS:
Has the shrink disk connection been checked for slippage?
3.10.2
Brake option:
Is the brake correctly adjusted?
3.20
Option MT:
Is the belt correctly tensioned?
3.13
Option WX:
Has the speed monitor been functionally connected?
4.9
Table 11: Optional checklist for commissioning
Pos: 15 0 /Anlei tung en/G etrieb e/5. In spekti on un d Wartu ng/5. Ins pekti on und Wartung @ 23\mod_1531828817835_388.docx @ 2434012 @ 1 @ 1

Table of Contents

Related product manuals