Installation
3-2
Part 1120277_01
E 2012 Nordson Corporation
Installation Tasks
The installation sequence is as follows:
1. Verify that the required installation conditions and utilities exist.
2. Unpack and inspect the melter.
3. Mount the melter on the parent machine or support structure.
4. Configure the electrical service.
5. Connect hot melt hoses and guns.
6. Connect a compressed air supply.
7. Set up the melter to work with the manufacturing process.
8. (Optional) Install inputs and outputs.
9. Installoptionalequipment.
10. Set up the melter for gear-to-line operation.
11. (If used) Connect a gun driver, pattern controller, or timer.
12. Flush the melter.
Experience of Installation Personnel
The instructions provided in this section are intended to be used by
personnel who have experience in the following subjects:
S Hot melt application processes
S Industrial power and control wiring
S Industrial mechanical installation practices
S Basic process control and instrumentation