EasyManua.ls Logo

Nordson PURBlue 4 - Page 42

Nordson PURBlue 4
250 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Opening the electrical enclosure
Installation
3-12
Part 1120277_01
E 2012 Nordson Corporation
Configuring the Electrical Service (contd)
2. Open the electrical enclosure door.
SeeFigure3-4.
3. Route the power cable through the back of the electrical enclosure and
under the electrical box tray to terminal block XT1 using the M -32 strain
relief in the ship with kit.
4. Connect each power cable lead to terminal block XT1. Table 3-3 lists the
terminals that are used for e ach of the electrical service types that are
compatible with the melter.
5. Connect the ground lead from the power cable to the ground lug that is
located on the chassis. The ground lug is marked PE/G.
XT1
L1
L2
L3
N
PE/G
EXAMPLE ONLY
(3/N/PE AC wiring
shown)
Figure 3-4 Connecting the power cable and ground lead

Table of Contents

Related product manuals