EasyManua.ls Logo

Nordson VersaBlue VA - Screwing on Light Tower (Option); Installation Personnels Experience

Nordson VersaBlue VA
272 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
3‐4
P/N 213828_11
2014 Nordson Corporation
VersaBlue_PPA
Screwing on Light Tower (Option)
The light tower is not attached upon delivery of the melter. Use the two
included screws to fasten the light tower to the top of the melter tower.
Installation Personnel's Experience
The instructions contained in this section are intended for personnel with
experience/authorization in the following fields:
Application methods with hot melt adhesive or similar materials
Industrial electrical wiring of power and control lines
Industrial mechanical installation
General knowledge of process control.
CAUTION: Illuminated seals may not be installed in the application system.

Table of Contents

Related product manuals