EasyManua.ls Logo

Nordson VersaBlue VZ100 - Page 74

Nordson VersaBlue VZ100
280 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
System ready
Operation
4-8
P/N 7105144G
2008 Nordson Corporation
VersaBlue_NW
Initial Startup (contd.)
4. Set seven-day clock.
Refer to Control Panel Overview / V8
5. Assign passwords and select security level, if desired.
Refer to Appendix A, Password and Control Panel Overview / V18,
V19.
6. Wait until the system is ready for operation (Fig. 4-6).
7. Tighten the gland on pump(s) (Refer to section Maintenance).
Fig. 4-6
8. Enable the motor(s) (Fig. 4-7).
9. Switch on the motor(s) (Fig. 4-7).
M2M1 M2M1
Control panel AND
standard I/O
Control panel
Standard I/O (XS 2)
All motors ON/OFF
(collective enable)
Standard I/O (XS 2)
Enable motor 2
Standard I/O (XS 2)
Enable motor 1
Fig. 4-7 Conditions for Motor running with and without interface Standard I/O

Table of Contents

Related product manuals