EasyManua.ls Logo

Nortek FG7MQ - PVC Components and Condensate Drains; PVC Component Installation; Condensate Drain Line Considerations

Nortek FG7MQ
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18

IMPORTANT NOTE



          
18)
are used when the inducer is rotated to vent
out thru the left or right side of the furnace cabinet.
NOTE:


           

be installed from inside the cabinet with the threaded


drain line to the threaded end.
Typical Orientation


them together using appropriate primer and cement.
Refer to the typical orientation shown in .
         

together using appropriate primer and cement.

NOTE: 


alignment with other vent pipes.
Alternate Orientation


bond them together using appropriate primer and
cement. Refer to the alternate orientation shown in
.

Permanently bond them together using appropriate
primer and cement.
         

together using appropriate primer and cement.

NOTE: 


alignment with other vent pipes.

IMPORTANT NOTE









2” PVC Tee
1/2” Tubing Formed
into a Loop
(Field Supplied)
PVC
Trap
2” PVC Pipe from Inline
Drain Assembly
(Not Included)
INSTALLATION OF PVC COMPONENTS
(TYPICAL ORIENTATION)
INSTALLATION OF PVC COMPONENTS
(ALTERNATE ORIENTATION)
2” PVC Pipe from Inline
Drain Assembly
(Not Included)
2” PVC Tee
2” PVC Elbow
(Field Supplied)
PVC
Trap
1/2” x 3/4”
Hose Barb
1/2” x 3/4”
Hose Barb
1/2” Tubing Formed
into a Loop
(Field Supplied)


ø 2 1/4” Rubber
Grommet
ø 7/8” Rubber
Grommet
ø 3/4” Rubber
Grommet
Flange
Gasket
FRONT
FRONT lettering must be
located near front
of furnace
Inlet Air
Finish Flange


Table of Contents

Related product manuals