line voltage power leads are securely connected and
the furnace is properly grounded.
      C) are
securely connected to the correct leads on the terminal
24).

10.0 inches of water column, and is not less than 4.5



     
      
    

  


in the line voltage circuit.

are leak free.

Before applying gas to the furnace, the iQ system must



heat



       

set the desired furnace rise.


Start-up Procedures

previous steps have been completed:

       
temperature.
3. Turn off all electrical power to the furnace.



page 26).
6. After 5 minutes of operation, set the thermostat below



IMPORTANT NOTE:




 

input rate, perform the following procedures:





in 28)
      
meter to complete one revolution.
5. Convert the time per revolution to cubic feet of gas per
hour using
30).
6. Multiply the gas flow rate in cubic feet per hr by the
heating value of the gas in Btu per cubic ft to obtain
 below.
EXAMPLE



Table 9 read 90 cubic ft gas per hr.



7. The manifold pressure must be set to the appropriate

agency or the gas supplier.
WARNING:

    
     


this installation by referring to Table 4.
       

input setting.
IMPORTANT NOTE:




+
Manifold
Adjustment Screw
Jumper
Switch

Table of Contents

Related product manuals