6
CAUTION:
Operating gas furnaces in construction environments can
cause a variety of problems with the furnace. Proper use
construction is recommended. This gas furnace may be
used during construction if it is not in violation of any
applicable codes and the following criteria are met:
furnace must be permanently installed according to the
instructions supplied with the furnace including electrical
supply, gas supply, duct work and venting. The furnace
must be controlled by a thermostat properly installed
according to the instructions supplied with the furnace
and thermostat. The installation must include a properly
when necessary.
structure and located such that dust and gases
from construction activity are not introduced into the
combustion system.
does not freeze in the furnace or condensate drain lines
overnight if turned off.
replaced or cleaned, the duct work must be inspected
and cleaned of any construction debris, and the furnace
must be cleaned and/or repaired if found to be dirty,
approved by applicable local authority even if this
acceptable). This information will be used to track the
furnaces. Proof of this submittal shall be available for
temperatures in ranges normally found in occupied
residences, including setbacks. Minimum continuous
Installation in a Garage
WARNING:
FIRE OR EXPLOSION HAZARD
garage with the provision that the burners and igniter are
The furnace must be located or protected to prevent
physical damage by vehicles.
combustible material listed in
. To obtain model
furnace rating plate, located inside of the furnace cabinet.
Access for positioning and servicing the unit must be
considered when locating unit. The need to provide
INSTALLATION CLEARANCES
............ ............
.......... ...............
................... ..........
†
NOTE: Allow 24 inches minimum clearance for servicing. Recommended
clearance is 36 inches.