Revision: I-UDSA-UK (02-19) PN 06 00116 UDSA R3
Supersedes: 1711UDSA-4E_GBEN
UDSA-4E
INSTALLATION
COMMISSIONING
SERVICING
These appliances meet the following EC direcves
(EU) 2016/426: GAR
DIR 2014/30/EU:EMC
DIR 2014/35/EU:LVD
DIR 2006/42/EC:MD
Please read this document carefully before commencing installaon, commissioning and/or servicing.
Leave it with the user or aached to the appliance or gas service meter aer installaon.
WARNING
Improper installaon, adjustment, alteraon, service or maintenance can cause property damage, injury or death. All
work must be carried out by appropriately qualied persons.
The manufacturer does not take any responsibility in the event of non-observance of the regulaons concerning the
connecon of the apparatus causing an evil operaon possibly resulng in damage to the apparatus and/or environment
in which the unit is installed.
Subject to modicaons
GAS FIRED BALANCED FLUE/FAN ASSISTED FLUE
UNIT HEATER