Do you have a question about the NORTH SAILS IC37 and is the answer not in the manual?
Beam | 3.50 m |
---|---|
Draft | 2.25 m |
Displacement | 4, 850 kg |
Sail Area (Upwind) | 77.0 m² |
Designer | Mark Mills |
Year Introduced | 2018 |
Hull Material | Fiberglass |
Rig Type | Fractional Sloop |
Berths | 6 |
LOA | 37 ft |
Sail Area (Downwind) | 2, 000 sq ft |
Keel Type | Fin with bulb |
Engine | Yanmar 29 HP |
Crew | 8 |
Fuel Capacity | 151 L (40 gal) |
Outlines crew setup and weight distribution based on class rules and recommendations.
Tasks and checks to perform before leaving the dock for a race.
Actions to take before the start, including sail trim and line checks.
Debriefing and boat preparation after a race.
Strategy and planning for race starts and execution.
Executing smooth steering and boat angle for a good start.
Communicating goals, positioning, and timing for the start.
Setting the mainsail and communicating speed build.
Jib trim communication and optimizing boat speed.
Assisting the trimmer and handling jib sheet duties.
Calling time and distance from the start line.
Controlling crew weight movement and counting down time.
Positioning the boat and making calls for the start.
Assisting with runner duties and final trim.
Executing smooth steering and focusing on boat angle and speed.
Communicating tack style, countdown, and runner adjustments.
Trimming main and traveler based on conditions.
Jib sheet adjustments and calls for speed build.
Assisting with jib sheet and vang duties.
Crossing to the new side and assisting with jib.
Tailing jib sheet or moving to the new side.
Crossing sides and clearing halyard.
Bringing on new runner or releasing old.
Executing smooth steering and landing on the correct angle.
Communicating tack style, countdown, and runner adjustments.
Trimming main and traveler, communicating speed build.
Jib sheet adjustments and calls for speed build.
Assisting with jib sheet and vang duties.
Crossing to the new side.
Tailing jib sheet or moving to the new side.
Crossing sides and clearing halyard.
Bringing on new runner or releasing old.
Executing smooth steering and keeping the boat on mode.
Communicating goals, tactical plays, and next moves.
Trimming main and communicating about mode and wind.
Talking with Helm about feel and mode.
Grinding on the primary winch for the trimmer.
Working on kinetics and trimming the jib downwind.
Working on kinetics and calling pressure.
Making sure spinnaker sheet is clear and ready for jibe.
Working on kinetics and moving aft in breeze.
Executing smooth steering and planning exit from the mark.
Communicating set type, style of exit, and plan.
Easing main to flatten boat and adjust for downwind settings.
Keeping bow at right angle until chute is at full hoist.
Communicating set type, style of exit, and plan.
Easing main to flatten boat and adjust settings.
Executing smooth steering and setting speed-build angle.
Communicating set type, style of exit, and plan.
Easing main to bear away and adjusting settings.
Making call on jib up/down and pulling clew.
Pulling tack out and loading lazy spinnaker sheet.
Easing vang and releasing cunningham.
Bouncing spinnaker up from mast and checking halyard.
Making sure halyard is clear and feeding head/tack.
Moving forward to help with jib down or overhaul jib sheet.
Executing smooth steering and working hard on speed.
Communicating type of set, style of exit, and plan.
Easing main to bear away and adjusting settings.
Making call on jib up/down and pulling clew.
Executing smooth steering and working on turn rate vs. tactical situation.
Communicating type of jibe and countdown time.
Jibing the main and controlling ease.
Easing spinnaker sheet and overhauling new sheet.
Pulling pole/tack out and loading lazy spinnaker sheet.
Easing vang to mark and pulling pole out.
Bouncing spinnaker up from mast and checking halyard.
Making sure halyard is clear and feeding head/tack.
Moving forward to help with jib down or overhaul jib sheet.
Executing smooth steering and working on turn rate.
Communicating type of jibe and countdown time.
Jibing the main and controlling ease.
Controlling spinnaker sheet and helping with angle.
Tailing new sheet and getting ready.
Jibing the jib and pulling it in tight.
Bouncing the chute around or pulling from cockpit.
Checking bow is clear and bouncing spin sheet.
Jibing runners with Tactician or taking care of the vang.
Looking around, bringing bow down, and steering.
Communicating drop exit and countdown.
Setting up main for the beat and grinding winches.
Easing spinnaker sheet and overhauling sheets.
Pulling pole in and getting tail of jib sheet.
Setting outhaul and cunningham, blowing halyard/tack.
Pulling chute down with string line.
Making sure string line is clear and pulling sail.
Staying back and helping set up runners.
Looking around, bringing bow down, and steering.
Communicating drop exit and countdown.
Setting up main for the beat and grinding winches.
Easing spinnaker sheet and overhauling sheets.
Pulling pole in and getting tail of jib sheet.
Setting outhaul and cunningham, blowing halyard/tack.
Pulling chute down with string line.
Making sure string line is clear and pulling sail.
Staying back and helping set up runners.
Crew weight distribution and positioning for winds over 12 knots.
Crew weight distribution and positioning for light air conditions.
Crew weight distribution and positioning for drifting conditions.