Page 2 of 4
· Before installation; consider the best
place to position the rail, taking into
account all activities it may be used
for, e.g. sitting, standing, reaching.
· They are intended to be used to
provide gripping or handle positions
around doorways, stairwells,
bathrooms and other similar
applications.
· After the position of the rail is chosen
for optimum use by the client, consider
the structure of the wall and avoid any
electrical/plumbing behind the wall.
· Important; after installing the product,
perform a final tighten and inspection
of all fasteners.
· Test the installation by vigorously
pulling on the rail. The rail should be
rigid and stable.
· Fully read these instructions before
installation and use
· This Grab Rail must be correctly
assembled, installed, and
maintained.
· This product must be installed by a
suitably qualified, competent
person.
· Only install the product in an area
where the mounting surface is
structurally sound.
· Strengthening modifications to the
fixing surface may be required
· Only install this product with fixings
matched to the grab rail, type of
mounting surface and the loading
conditions to be applied. NRS is
unable to specify the type of fixing
to use because of the vast number
of possible types and surface
condition to which the grab rail may
be attached
· The maximum Load of this product
is 95kg (15st) based on the product
being fitted to a suitable surface
using appropriate fixings and fitted
by a competent person.
· Do not place matches or cigarettes
on or near this product