ErP
COMPLIANT
2016
XBOXER XBC
UNIT SIZES 10 - 65 WITH
ECOSMART CONNECT CONTROL (CO)
INSTALLATION, OPERATING AND
MAINTENANCE INSTRUCTIONS
FOR THE COMPLETE VENTILATION SOLUTION
M
A
D
E
I
T
N
H
E
U
K
M
A
D
E
I
T
N
H
E
U
K

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the NuAire XBOXER XBC25-H-AS Series and is the answer not in the manual?

NuAire XBOXER XBC25-H-AS Series Specifications

General IconGeneral
Heating Capacity25 kW
Dimensions (H x W x D)24 x 24 x 24 inches
Shipping Weight150 lbs
ApplicationCommercial Heating
Voltage208/240/480 V
Phase3 Phase
Airflow2000 CFM
Sound Pressure at 10 Feet65 dB

Summary

4.0 Erection and Assembly

6.0 Installing Fan Units and Attenuators

6.1 Installing Attenuators

Details the method for supporting and securing attenuators to the fan unit.

7.0 Commissioning and Setting To Work

8.0 Control Strategy Description

8.1 General System Overview

Overview of the BACnet MS/TP enabled controller integrated into the system.

8.4 Room Module Integration

Describes the connection and functionality of Ecosmart Connect Room Modules.

8.6 Sensor Integration and Control

Details sensor integration for temperature, humidity, CO2, and pressure controls.

8.7 Configurable Modes

Explains configurable modes activated via switched live input 2.

8.8 Temperature Control Modes

Details supply and room temperature control strategies, including bypass.

8.14 Alarms and Protection

Details critical alarms, maintenance alarms, thermal trip, and frost protection.

10.0 FC Bus Devices

10.4 Touch Screen Field Advanced Display

10.5 Quick Setup

Provides steps for quickly setting up the FAD with target objects and favourites.

10.5.1 Setting Up A Target Object

Guides on selecting a target device and object on the network.

10.5.3 Setting Up Security

Details how to set up user and service passwords for security.

10.5.5 Alarm Log

Explains how alarm events are logged and displayed on the LCD.

11.0 SA Bus Devices

11.1 Room Module Details

Details the electronic, wall-mountable sensors designed for the Nuaire control panel.

11.8 Room Modules Technical Specifications

Provides detailed technical specifications for Room Modules.

12.0 Appendix To Software Strategy

12.2.4 Writing Of Values (Priority Array)

Explains how BACnet priority arrays manage value conflicts.

13.0 Connection and Wiring Diagrams

13.2 I/O Damper Connection

Details the wiring for 24V actuators on I/O dampers.

13.3 Basic Connection Diagram

Shows the basic electrical connection diagram for the unit.

13.7 XBC10-15 (Electric Heater) Wiring

Wiring diagram for units with electric heating.

13.8 XBC25-65 (Electric Heater) Wiring

Wiring diagram for larger units with electric heating.

14.0 Commissioning

14.1 Basic Commissioning

Outlines the fundamental software-based commissioning process.

14.1.1 Setting Fan Airflow (Min/Max)

Procedure for setting minimum and maximum fan speeds.

14.1.2 Setting Fan Run-on Time

Setting the run-on time for the fan based on enable signals.

14.1.3 Setting Trickle Mode

Configuring trickle mode for continuous low-speed fan operation.

14.1.4 Setting Setpoint (No Display Modules)

Adjusting the controller setpoint when no display modules are fitted.

14.2 Commissioning Checklist

A checklist to ensure all aspects of commissioning are completed correctly.

14.3 Fan & Motor Checks

Instructions for checking fan and motor operation, rotation, and current draw.

15.0 Maintenance Procedures

Related product manuals